Wireless BMS
HVAC control for buildingswithout a BMS
Sensgreen Wireless BMS retrofits split ACs, FCUs, radiators, VRF systems and sockets using wireless controllers (LoRaWAN and Wi-Fi) and gateways, so you can standardise schedules, stabilise comfort, and eliminate after-hours waste with minimal disruption.
Get a demoBring BMS-level control fast by unifying multi-vendor devicesand sensors into one coordinated HVAC operating layer, with no rewiring.
Most buildings were never built for a full BMS. That should not block modern control. In many sites, HVAC is still managed room by room. Systems start early, run late, and drift over time. Comfort becomes reactive, and energy waste becomes normal. Wireless BMS changes the operating model quickly by giving you centralised schedules, controlled setpoint ranges, and exception alerts, without rewiring or invasive works.
What Wireless BMS delivers
Zone schedules
| Zone | Days | Hours |
|---|---|---|
| Office east | Mon–Fri | 07:00–19:00 |
| Meeting rooms | Mon–Fri | 08:00–18:00 |
| Reception | Mon–Sat | 07:00–20:00 |
| Server room | All week | Continuous |
Central control without rewiring
Add BMS-like control capabilities without cabling and without replacing existing equipment.
Schedules that actually stick
Standardise operating hours and prevent schedule drift across zones and tenants.
Setpoints with governance
Define comfort bands, reduce random overrides, and keep operation consistent.
Wireless sensor driven control
Easily add wireless window, occupancy, IAQ, and outdoor weather sensors, then use those signals to avoid conditioning empty spaces and react to real conditions.
Measurable runtime reduction
Cut after-hours operation and track where waste returns through clear exceptions.
Operational visibility with AI-assisted insights
See what is running and why, highlight the highest-impact zones, and get suggestions for schedule improvements based on real usage patterns.
What you can do with Wireless BMS
Operating rules
- After-hours shutdown
- Active
- Setpoint band
- 21–24°C
- Holiday mode
- Scheduled
- Peak protection
- Off
After-hours shutdown
Automatically stop HVAC and sockets outside operating hours and flag exceptions.
Zone scheduling by tenant or floor
Run different schedules per area without manual daily changes.
Setpoint governance
Keep comfort within approved bands and track overrides.
Peak and high-load protection
Reduce avoidable runtime during high-load periods using simple rules.
Holiday and event modes
Apply special schedules instantly across selected zones.
Controlled assets
Automation
- Sensor inputOccupancy, window status, outdoor weather
- RuleNo occupancy detected for 45 minutes
- ActionSet back the zone and log the exception
Split AC, LoRaWAN
Central scheduling, setpoints, modes, and runtime visibility.
Radiator valves, LoRaWAN
Room-level heating control for stable comfort.
FCU thermostats, LoRaWAN
Setpoints and fan control for better zone consistency.
VRF indoor and outdoor units, protocol converter gateway
Unified control and visibility through gateway integration.
Sockets, LoRaWAN
Schedule plug loads to reduce avoidable after-hours consumption.
Case study
Coordinated split AC control in Davao City
Bringing individually operated split air conditioners into a shared monitoring and control dashboard.
- 12% reduction in overall energy consumption
- 6,000 hours less AC run time each month
- 40% faster maintenance response via remote diagnostics
- Unified control of 150 units from a single dashboard

What is a wireless BMS?+
Sensgreen Wireless BMS retrofits Split ACs, FCUs, radiators, VRF systems and sockets using LoRaWAN devices and gateways, so you can standardise schedules, stabilise comfort, and eliminate after-hours waste with minimal disruption.
Can I get BMS-level control without rewiring?+
Yes. Wireless BMS adds BMS-like control capabilities without cabling and without replacing existing equipment.
Which equipment can be controlled?+
Split ACs, radiator valves and FCU thermostats over LoRaWAN, VRF indoor and outdoor units through a protocol converter gateway, and sockets for plug loads.
How quickly can a site go live?+
A first area can typically go live in 5 to 15 business days, then expand floor by floor.
How are local overrides handled?+
Comfort bands define what can be set locally. Keep comfort within approved bands and track overrides, with exceptions flagged when equipment runs outside operating hours.


















